iCode Workbench · Migration

Migrate from Orca to iCode Workbench

Orca and Workbench can coexist. This is a five-step migration for teams that want a local, review-first task queue without giving up Orca's broader surfaces. You do not need to move everything at once; start with one task and decide after a week.

iCode Workbench is our product. This page is written to be useful even if you decide to stay with Orca; the “When to stay” section is not an afterthought.

This guide is currently available in English only.

What migration means

Migration is not a data import. Workbench does not import Orca tasks, sessions, bots, schedules, or settings. What transfers is your repository, your agents, and your subscriptions; the workflow is recreated task by task.

That is intentional. A queue that imports stale tasks and half-finished sessions creates a second source of truth. Start with one task that needs review, run it in both tools if you want, and compare the review experience. The unit of migration is a task, not a workspace.

Keep Orca installed during the evaluation. The two tools can coexist on the same machine, and Orca's worktrees are ordinary Git worktrees — they are not touched by Workbench.

Before you start

  • Install Workbench on Windows, Linux, or macOS. Keep Orca installed.
  • Open the same repository. Workbench creates a worktree per session; your existing Orca worktrees remain.
  • Know the review model. Review happens in the session checkout, and the review decision is separate from process exit.
  • Pick one task that needs review. A task with a real diff and a clear done-when command is a better test than a trivial one.

If you are new to the workflow, read how to run multiple coding agents in parallel and how to review AI-generated code.

Step 1: Install Workbench, keep Orca

Install Workbench and leave Orca in place. You are not committing to a switch; you are adding a review-first queue beside the tool you already use. Both can run at the same time.

Workbench is free and open source under AGPL-3.0. It is pre-1.0, so features and storage schemas may change between releases. If AGPL-3.0 is a blocker for your organization, Orca's MIT license may be the decisive difference; that is covered below.

Step 2: Open the same repository

Add the repository to Workbench. New sessions get their own Git worktree and branch, starting from the current HEAD. Your existing Orca worktrees are untouched; they are just directories with branches.

If you want to reuse an Orca worktree's branch, create a new session from that branch in Workbench. Do not point two tools at the same working directory at the same time; the isolation is per checkout, and sharing one defeats it.

Step 3: Move one task, not the queue

Pick one task that needs review and queue it in Workbench. Set the slot limit to 1 for the first run: one task, one checkout, one review.

Give the task a goal, owned paths, a done-when command, and an out-of-scope list. The task statement is the part that makes the review possible; without it, you are comparing two tools on a vague diff.

For the queue model, read how to queue coding agent tasks.

Step 4: Review in the session checkout

When the agent finishes, review the diff in the checkout where it worked. Use Files, Search, and Source Control; leave line notes; run the done-when command yourself. Then make the review decision: accept, revise, or reject.

The decision is separate from process exit. A completed task can still be rejected, and a rejected task can be revised and re-reviewed. This is the part of the workflow to compare with Orca: not which tool has more features, but whether the review is a real gate or a summary.

Step 5: Decide after a week

Run one or two tasks a day for a week. At the end, ask:

  • Did the review happen in the checkout, or did you fall back to reading a summary?
  • Did the queue tell you what needed you, or did you track sessions in your head?
  • Did the work stay on your machine?
  • Did you miss Orca's mobile, remote, browser, or bots?

If the answers favor Workbench for the review-gated work, keep it for that work. If you need Orca's broader surfaces, keep Orca for those and use Workbench for the tasks that need a review gate. A split setup is a valid outcome.

What to compare in the first week

DimensionOrcaWorkbenchWhat to watch
Review Annotated diff, draft commits and PRs Diff in the session checkout, line notes, separate decision Did you read the diff, or the summary?
Task model Orchestration, automations, bot triggers Durable queue with explicit states, retries, schedules Does the queue tell you what needs you?
Data Local plus hosted features Local SQLite, no telemetry, no hosted service Where does the state live, and who can read it?
Surfaces Desktop, mobile, remote, browser, bots Desktop, local Which of Orca's surfaces do you actually use?
License MIT AGPL-3.0 Can your organization accept AGPL-3.0?

Compare the workflow you actually run, not the feature list. A tool with fewer surfaces can still be the better fit if the review is the part you need to fix.

A week-one plan

  1. Days 1–2: install, open the repository, run one review-needing task, and review the diff in the checkout.
  2. Days 3–5: run one or two tasks a day. Note review time, queue wait time, and any merge or setup problem.
  3. Days 6–7: compare the notes with your Orca week. Decide whether Workbench owns the review-gated work, whether Orca keeps the broader surfaces, or whether you stay with Orca.

A split setup is a valid result. The goal is not a winner-takes-all migration; it is a review loop that actually happens.

What doesn't transfer

  • Tasks and history. Recreate the task in Workbench; there is no import.
  • Orca sessions and bots. They stay in Orca. Workbench has no Slack, Linear, or GitHub bot integration.
  • Schedules. Recreate the ones you still need as ordinary queued tasks.
  • Orca settings and presets. Set up Workbench's defaults separately.
  • Git history and worktrees. These are in the repository, not in either app; they remain.

When to stay with Orca

If any of these is a requirement, Orca is the better fit today:

  • Mobile. Orca has iOS and Android companions; Workbench is desktop-only.
  • Remote and SSH. Orca supports remote servers, SSH worktrees, and experimental cloud VMs; Workbench is local.
  • Browser and Design Mode. Orca embeds Chromium and can send a clicked element to an agent; Workbench does not list that surface.
  • Slack, Linear, and GitHub bots. Orca takes work from those surfaces; Workbench does not.
  • Maturity. Orca is on a 1.4.x release line; Workbench is pre-1.0.
  • License. Orca is MIT; Workbench is AGPL-3.0. If your organization cannot accept AGPL-3.0, that is decisive.

A migration page that hides this is a sales sheet. If you need those surfaces, keep Orca and use Workbench only for review-gated work — or stay with Orca entirely.

Migration checklist

  1. Install Workbench; keep Orca installed.
  2. Open the same repository; confirm existing Orca worktrees are untouched.
  3. Pick one task that needs review; write the goal, owned paths, done-when, and out-of-scope.
  4. Set the slot limit to 1; queue the task.
  5. Review the diff in the session checkout; run the verification yourself.
  6. Record the review decision separately from process exit.
  7. Run one or two tasks a day for a week.
  8. Decide: Workbench for review-gated work, Orca for the broader surfaces, or both.

For recent changes, see the changelog.